Subject: [SIR-Mail] No.405: SANT: data gap From: Laura Sanchez ******************************************************************************** SIR Electronic Mail 2012-07-13 11:08:34 UTC Message No. 405 ******************************************************************************** Author: Nic Flores, UNAVCO The Santiago, Chile station (SANT) experienced a power surge on 2012-05-06 which left the station without power. Once the locals repaired their critical systems we got news that the power adapter to the Ashtech receiver was damaged. A replacement power adapter was sent to the station and the locals have installed it. The receiver is now powered up and properly functioning. There is a data gap from 2012-05-06T12:15 to 2012-07-10T20:44. Maintenance and operations of the SANT station is a collaborative effort supported by JPL, UNAVCO, SSC Chile, and IDA with funding provided by NASA´s Earth Surface and Interior Focus Area - Science Mission Directorate. Best Regards, Nic Flores ********************************************************************************